1st International exhibition «ERGO.TEC / CONSTRUCTION MACHINERY»

Published on 2023-03-30 in category: Exhibitions - Conferences - Workshops

Bannergia299x68-2-750x171

We are looking forward to meeting you at the 1st International exhibition "ERGO.TEC / Construction machinery". You may find us in booth D16 at the M.E.C. in Paiania from 21st to 23rd April 2023.

5th National Conference on Seismic Engineering and Technical Seismology

Published on 2022-10-11 in category: Exhibitions - Conferences - Workshops

Screenshot_2022-10-06_at_11

Our company will participate in the exhibition, Booth 8, of the 5th National Conference on Seismic Engineering and Technical Seismology from October 20th to October 22nd at the Royal Olympic Hotel in Athens. The conference is organised by the Hellenic Association for Earhtquake Engineering and the Technical Chamber of Greece.

Well pumps & skimmers by Dimaco SAS

Published on 2020-11-09 in category: Special construction & industrial equipment

Dimaco_article
  • Dimaco_article
  • Dimaco_banner_products
  • Dimaco_banner_pneumatic

We are happy to introduce our new supplier in well pumps and skimmers, Dimaco SAS, Italy. Contact us for more information!

Pull-out test equipment with test parameter monitoring system

Published on 2020-06-26 in category: Case studies

Slide1
  • Slide1
  • Slide2
  • Slide3
  • Slide4
  • Slide6
  • Slide7
  • Slide8

Project: Pull-out test equipment with test parameter monitoring system
Client: Laboratory of Soil Mechanics/Department of Civil Engineering, National Technical University of Athens
Project location & date: Zografou, February 2016

In autumn 2015, the Laboratory of Soil Mechanics, led by Dr. G. Gazetas, assigned to our company the implementation of the pull-out test equipment, as well as the necessary instrumentation to monitor the test parameters.

The test equipment was manufactured in a machinary shop in Athens, under our supervision, whereas its design was based in bibliographical data and the Laboratory research team's instructions. The pulling and pressurizing devices are adjusted on the basic equipment, as well as the following monitoring instruments, manufactured by Sisgeo Srl, Italy:

All instruments are connected to an OMNIA datalogger.

Inspection & inclinometer measurements in bored piles

Published on 2020-06-25 in category: Case studies

Slide1
  • Slide1
  • Slide2
  • Slide3
  • Slide4
  • Slide5
  • Slide6

Project: Inspection & inclinometer measurements in bored piles in Kokkini site
Client: 3K TECHNIKI SA
Project location & date: Kokkini, March 2020

Our company was assigned taking inclinometer measurements in order to monitor the inclination of bored piles near facilities operated by the Water Supply and Sewerage Company (EYDAP SA). The measurements and diagrams were elaborated with the dedicated software into a full technical report.

The company-owned equipment used by our specialized personnel for this project was manufactrued by Sisgeo Srl, Italy:

Moreover, our well camera by Pasi Srl, Italy, was also used for the inclinometer borehole inspection.

Landslide geotechnical monitoring system in Metsovo

Published on 2020-06-23 in category: Case studies

Slide1
  • Slide1
  • Slide2
  • Slide3
  • Slide4

Project: Supply & installation of geotechnical instrumentation for landslide monitoring
Client: University of Patras / Special Account for Research Funding
Project location & date: Metsovo, 2018 & 2019

The project was tendered as part of the operational programme "Epirus 2014-2020", regarding the development of a recording, monitoring and risk management landslide system with the application of up to date geotechnical and satelite methodologies, and it was implemented by the Engineering Geology Laboratory, Geology Department of the University of Patras.

For the implementation of the the aforementioned project, the following instrumentation, manufactured by Sisgeo Srl, Italy, was supplied:

The instruments installation was carried out by our specialized personnel in the city of Metsovo.

Noise & vibration monitoring in Sepolia construction site

Published on 2020-06-23 in category: Case studies

Slide1
  • Slide1
  • Slide2
  • Slide3
  • Slide4
  • Slide5
  • Slide6
  • Slide7

Project: Noise & vibration monitoring in Athens Railway construction site
Client: INTRAKAT SA
Project location & date: Sepolia, December 2019

Our company has undertaken sound and vibration measurements during the construction of diaphragm walls, part of the project "Construction of an underground quadruple railway line in Sepolia, Athens", which is being carried out by INTRAKAT SA.

The measurements were implemented by our specially trained personnel using our company-owned equipment:

Seismic & geotechnical monitoring of 3rd LNG Tank in Revithoussa

Published on 2020-06-22 in category: Case studies

Revithoussa
  • Revithoussa
  • Slide2
  • Slide4
  • Slide6
  • Slide7
  • Slide8

Project: Supply & installation of seismic & geotechnical monitoring instrumentation for the 3rd LNG Tank in Revithoussa island
Client: J&P AVAX SA
Project location & date: Revithoussa isl., 2017-2018

In summer 2017, 20 years after supplying the instruments for the first two tanks, our company was assigned the supply & installation of the monitoring system for the 3rd LNG Tank in Revithoussa island. The equipment supplied included seismic and geotechnical instruments, along with their dataloggers and software, as well as a Database for the data presentation. The project special specifications indicated that all permanently installed sensors (accelerometers, tiltmeters) should be placed inside anti-explosive ATEX certified enclosures.

The monitoring system includes the following equipment, manufactured by Sisgeo Srl, Italy and GeoSIG Ltd, Switzerland:

Our specialized personnel and partners carried out the system installation, commissioning and personnel training.

Supply & installation of tiltmeters in Ptolemaida Power station

Published on 2020-06-22 in category: Case studies

Slide1
  • Slide1
  • Slide2
  • Slide3
  • Slide4
  • Slide5

Project: Supply & installation of tiltmeters for differential movement monitoring in Ptolemaida Power station
Client: Public Power Corporation (PPC) SA
Project location & date: Ptolemaida, September 2018

Our company was assigned the supply and installation of the below geotechnical instrumentation, manufactured by Sisgeo Srl, Italy, with the scope of monitoring differential movement in Ptolemaida power plant:

The monitoring system was installed and commissioned by our specialized experts in September 2018.

Monitoring equipment for marble mines in Northern Greece

Published on 2020-06-18 in category: Case studies

Slide1
  • Slide1
  • Slide2
  • Slide3
  • Slide4
  • Slide5
  • Slide6

Project: Supply & installation of monitoring instruments in marble mine in Northern Greece
Client: FHL I. KIRIAKIDIS Marbles & Granites SA
Project location: Volakas, Venus & Thasos marble mines

Since 2015, our company has supplied numerous geotechnical and other instruments for the monitoring of three marble mines (Volakas, venus & Thasos), owned by FHL I.KYRIAKIDIS.

The instrumentation supplied comprises mostly geotechnical instruments, manufactured by Sisgeo Srl, Italy, such as:

Moreover, the following equipment has also been supplied:

All equipment waw installed on-site by our specialized personnel.